Course Code: CEC 112
68 Course Visits
Sloping, Benching, Embankments and Bundwalls
Course Sector:
Civil Engineering
Course Dates and Locations
Choose a date and location to book your seat
No.
Date
Days
Location
Fees
Enrollment
01
08 - 12 Sep 2025
5 Days
Dubai, UAE
$4,250
02
15 - 19 Dec 2025
5 Days
Dubai, UAE
$4,250
Introduction
Training course introducion / brief

This course provides comprehensive insights into the principles, techniques, and safety considerations associated with soil excavation, stabilization, and earthwork practices. Sloping, benching, embankments, and bundwalls are critical elements of construction projects that involve earthmoving and soil manipulation.

Participants will gain the knowledge and skills to evaluate soil types, select appropriate excavation and backfilling methods, implement protective systems, and ensure compliance with structural and environmental requirements. The course emphasizes practical applications and the latest standards for safe and efficient earthwork operations.

Course Objectives
At the end of the training course, participants will be able to

  •   Identifying soil excavation/backfilling equipment in accordance with soil type and different excavation/backfilling purposes.
  •   Estimating soil excavation production rates.
  •   Learning how to select appropriate excavation protective systems.
  •   Matching fill and compaction requirements.
  •   Identifying compaction equipment/test in accordance with soil type and excavation/backfilling purposes.
  •   Identifying compaction degree required for structural /non-structural areas.
  •   Identifying Factors affecting compaction/compaction degree.
  •   Identifying appropriate protective systems (shoring of excavation sides),shoring/shielding techniques, sloping/benching, maximum allowable slopes.
  •   Identifying requirements of soil stabilization and different types of material applied to side slopes.
  •   Identifying soil improvement required in accordance with soil types and technique adopted.

Course Audience
Who is this course for, and can benefit the most
coming soon
Course Outline
The course aims and learning outcomes

Fundamentals of Soil Excavation and Earthwork

       Introduction to Soil Types and Properties:

  •    Soil classification systems
  •    Soil behavior under load and excavation

        Excavation Equipment and Methods:

  •    Matching equipment to soil type and excavation purpose
  •    Estimating soil excavation production rates

        Protective Systems for Excavation:

  •    Overview of shoring, shielding, sloping, and benching
  •    Introduction to maximum allowable slopes and safety regulations

        Practical Session: Soil type evaluation and excavation planning

 Compaction and Backfilling Techniques

       Compaction Principles:

  •    Factors affecting compaction and compaction degree
  •    Structural vs. non-structural compaction requirements

        Compaction Equipment and Testing:

  •    Selecting equipment based on soil type
  •    Common compaction tests (e.g., Proctor, CBR, field density tests)

        Backfilling Methods:

  •    Matching fill materials to project requirements
  •    Layering and compaction techniques

        Practical Session: Hands-on compaction and testing exercises

 

 Sloping and Benching in Excavation

        Principles of Sloping and Benching:

  •    Design and implementation of stable slopes and benches
  •    Slope stability analysis methods

       Protective Systems for Slope Stability:

  •    Shoring and shielding techniques for excavation sides
  •    Introduction to soil stabilization methods for side slopes

   Case Studies: Successful sloping and benching techniques in projects
  Practical Session: Designing slopes and benches for specific soil types

Embankments and Bundwalls

  •    Design and Construction of Embankments:
  •    Embankment materials and stability considerations
  •    Factors affecting settlement and slope stability

        Bundwalls Design and Applications:
  •    Role of bundwalls in flood control and containment
  •    Materials and construction methods for bundwalls

        Soil Improvement and Stabilization:
  •    Techniques for soil stabilization (e.g., lime, cement, geosynthetics)
  •    Importance of drainage in embankments and bundwalls
  •    Practical Session: Embankment and bundwall design exercises

Safety, Sustainability, and Project Applications
        Safety Standards in Earthwork Operations:

  •    Regulatory requirements and risk management
  •    Common hazards and safety measures

        Environmental Considerations:
  •   Minimizing environmental impact during excavation and earthworks
  •   Erosion control and sediment management

        Performance Monitoring and Maintenance:
  •    Long-term monitoring of embankments and slopes
  •    Rehabilitation techniques for failed slopes and embankments

       Course Review and Final Case Study:
  •    Participants will develop a comprehensive plan for a real-world excavation, embankment, or bundwall project.

Providers and Associations
Providing the best training services and benefits to our valued clients
Boost certificate of completion
BOOST's Professional Attendance Certificate “BPAC” is always given to the delegates after completing the training course, and depends on their attendance of the program at a rate of no less than 80%, besides their active participation and engagement during the program sessions.
ENDORSED EDUCATION PROVIDER
Over all rating
Excellent
Average
Below average
Flexible deadlines
Customized dates accordance to your schedule
Shareable Certificate
Earn certificate upon completion
COURSE METHODOLOGY

Our Training programs are implemented by combining the participants' academic knowledge and practical practice (30% theoretical / 70% practical activities).

At The end of the training program, Participants are involved in practical workshop to show their skills in applying what they were trained for. A detailed report is submitted to each participant and the training department in the organization on the results of the participant's performance and the return on training. Our programs focus on exercises, case studies, and individual and group presentations.

Trending Courses
The most bespoke and flexible training courses
01
Sep
- 05 -
Days
Certified Business Analysis Professional- IIBA
Dubai, UAE
10
Feb
- 05 -
Days
The Scheduling Professional (PMI-SP Exam Preparation)
Dubai, UAE
24
Nov
- 03 -
Days
Happiness To Have and Hold
Dubai, UAE
07
Apr
- 05 -
Days
IOSH Managing and Working Safely
Abu Dhabi, UAE
15
Dec
- 05 -
Days
The Business Analyst (PBA) - PMI Certified
Dubai, UAE
10
Aug
- 05 -
Days
Emotional Intelligence and Advanced Communication Skills for Leaders
Salalah, Oman
18
Aug
- 05 -
Days
ISO 55001 2014 Lead Auditor (Asset Management Systems) – Lead Auditor
Muscat, Oman
01
Sep
- 05 -
Days
Introduction to Machine Learning and Artificial Intelligence
Abu Dhabi, UAE
17
Feb
- 05 -
Days
Artificial Intelligence for Leaders
Abu Dhabi, UAE
30
Jun
- 05 -
Days
The Risk Management Professional (PMI-RMP Exam Preparation)
Istanbul, Turkey
14
Sep
- 05 -
Days
Competitive Bidding: Understanding Procurement Bids
Riyadh, KSA
20
Jan
- 05 -
Days
Certified Treasury Professional
Dubai, UAE
13
Apr
- 05 -
Days
OSHA: Occupational Safety and Health Administration Standards
Riyadh, KSA
18
May
- 05 -
Days
Professional in Business Analysis (PMI-PBA Exam Preparation)
Jeddah, KSA
20
Jan
- 05 -
Days
Leading and Building a Positive, Motivated, and Empowered Teams
Online, Virtual
10
Nov
- 05 -
Days
Practical Negotiation Skills for Contract Management
Jeddah, KSA